Inspection Status: Approved
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 06/02/2004 |
ROOF NAILING |
|
Approved |
IVRS - Inspection :* |
| 03/31/2004 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999*/ 1) DETAIL 10/S4 REQUIRES 1" X 8" BOLTS-1/2" USED 2) ROOF JOIST CONNECTION STEEL STRUCTURE IS NOT BUILT PER 19/S3. HAVE ENGINEER OF RECORD/SPECIAL INSPECTOR CERTIFY STEEL CONSTRUCTION 3) HANGERS NOT PER 9/S4 4) OSB PANELS MUST SPAN 2 BAYS- ( 3 JOIST) 5) OSB PANELS CANNOT BE INSTALLED WITH GRAIN PARALLEL TO SUPPORTS |