Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 04/07/2006 | PLUMBING - INTERMEDIATE | Partial Approval | 5.9 PSI 9:38 PRESSURE TEST OK OK TO COVER SECURE CLOSET FLANGES TO FLOOR W/CORROSION RESISTANT ANCHORS |
|
| 03/21/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 5 PSI AT 9:58 ZERO 10:08 CORRECT LEAK PRESSURE TEST BEFORE INSPECTION. |
|
| 03/08/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSTALL HOT WATER LINE PER PLAN AND TEST 3" CLEANOUT PLUG GLUED IN GAUGE STUCK ON 4 PSI -- NOT OPERATING REPLACE CLEAN OUTS, INSTALL ABOVE TOILET. PROVIDE 5 PSI TEST |
|
| 03/02/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. 3" SANT INSTALLED UPSIDE 2. COMBO NOT CORRECT FITTING FOR FIXTURE CONNECTION A SAN TEE IS REQUIRED TO PROPERLY VENT FIXTURE (2X1 1/2) SANITARY TEE. 3. SWEEP REQUIRED FOR HORIZONTAL TO HORIZONTAL CHANGE OF DIRECTION. 4. 1 1/2" TRAP ARM IS MAX SIZE FOR LAVATORY RETEST AND RECALL FOR INSPECTION. |
|
| 02/09/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE A 3" VTR REPLACE DAMGED SANTEE ON VENT PROVIDE PROPER DRAINAGE FITTINGS FOR LAVATORY'S REMOVE CONCRETE FROM COPPER WATER SUPPLY PROVIDE A 5 PSI AIR TEST ON UNDERGROUND AND INTERMEDIATE PIPING (DWV) |
|
| 01/17/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* FLOOR AND WALLS HAVE BEEN COVERED PROVIDE HISTORY OF PLUMBING INSPECTIONS OR UNCOVER ALL PLUMBING AND PROVIDE A WATER TEST SYSTEM |