Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 07/03/2003 |
ROOF NAILING |
|
Approved |
IVRS - Inspection 0000* |
| 07/01/2003 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999* 1)PERLING MUST BE SUPPORTED WITH U-24 HANGERS ON EACH END WITH ALL PERLING INSTALLED VIRTUALLY NOT IN THE FLAT. 2) ROOF SHEATHING MUST BE NAILED TO PERLING. 3) TRUSS DRAWINGS MUST BE APPROVED BY CITY OF TUCSON. 4) 4 X 12 BEAM MUST BE SECURED BY 1/2" BOLTS. |
| 06/27/2003 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999*/ 1) NEED TRUSS DRAWINGS AND LAYOUT SHEET |
| 06/17/2003 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999*/ 1) ANCHOR BOLTS REQUIRED WITHIN 12" OF PLATE SPLICES AND ENDS 2) GLUE LAM BEAM NOT IN TO SUPPORT AT BAY WINDOW 3) NAIL DOUBLED TRUSSES AT 12" ON CENTER TOP AND BOTTOM CHORD 4) 1" SEPARATION REQUIRED BETWEEN PORCH POST AND CONCRETE 5) OVER SPAN AT FIREPLACE PROVIDE TRUSS PLANS |
| 06/04/2003 |
ROOF NAILING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) SHEATHING MISSING AT ROOF |
| 05/27/2003 |
ROOF NAILING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 03/24/2003 |
ROOF NAILING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |