Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T02CM04531

Parcel: 116122720

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
01/22/2003 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection 0000*1.) REVISED APPROVED PLAN OK
2.) ABS DWV UNDERGROUND OK WATER TEST OK
3.) OK TO COVER.
4.) REVIEWED JOINT SEWER AGREEMENT.
01/20/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*1.) YOU REVISED THE PLAN, BUT YOU STILL HAVE THE BLDG DRAIN PASSING THROUGH THE FOOTING. YOU MAY NOT DO THIS, WHETHER IT IS SLEEVED, OR NOT. HINT - REDESIGN THE FOOTING SO THAT DRAINAGE PIPING DOES NOT PASS THROUGH THE FOOTING.
2.) OK TO COVER BLDG SEWER FROM 2 WAY
CLEAN OUT TO TIE-IN AT EXISTING
3.) WILL REQUIRE JOINT SEWER AGREEMENT BEFORE FINAL.
01/09/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*1.) ROUGH IN NOT INSTALLED PER PLAN
2.) FOUNDATION LAYOUT NOT PER PLAN
3.) IF YOU OVERLAY THE FOUNDATION AND PLUMBING PLANS YOU WILL NOTICE THAT THE BUILDING DRAIN DOES NOT PASS THROUGH ANY FOOTINGS. HOWEVER, PLUMBING PLAN IS INCOMPLETE AND DOES NOT SHOW WASTE PIPING TO WASHER. RUN IT BACK THROUGH THE ARCHETECT, HE WILL ADD THE PLUMBING, AND SHOW YOU HOW TO CROSS THE FOOTING HAVE IT STAMPED BY THE PLANS EXAMINER, AND INSTALL PER THE REVISED APPROVED PLAN.
01/08/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*
1.) UNABLE TO LOCATE PLANS OR PERMIT.
2.) ABS BUILDING DRAIN MAY NOT PASS THROUGH A FOOTING.
3.) HORIZONTAL VENTING BELOW FLOOD LEVEL LIMITED TO STRUCTURAL CONDITIONS ONLY.