Inspection Status: Approved
Inspection History: ELECTRIC - ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 12/23/2002 |
ELECTRIC - ABOVE CEILING |
|
Approved |
IVRS - Inspection 0000* |
| 12/20/2002 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*FRONT SOUTH OFFICE ROOM NOT COMPLETE ON SIEMIC TIES. |
| 12/10/2002 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*ABOVE CEILING OK 1ST FLOOR EXCEPT FRONT CONFERENCE ROOM. |
| 12/09/2002 |
ELECTRIC - ABOVE CEILING |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 12/05/2002 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000*2ND FL. APPROVED. |
| 12/04/2002 |
ELECTRIC - ABOVE CEILING |
|
Denied |
IVRS - Inspection 0999*IN ADDITION TO THE TWO MIN. SIESMIC TIES, IT IS REQUIRED THAT THE RECESSED FIXTURE BE POSITIVELY ATTACHED TO THE CEILING GRID SYSTEM PER ADMIN CODE. CODE MODIFICATION. |