Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2003 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection 0000*ALL CORRECTIONS HAVE BEEN MADE. | |
| 02/24/2003 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999*1.) GAS PRESSURE TEST IS OK 2.) WASTE & VENT SYSTEM IS OK 3.) SOIL WATER TEST IS OK 4.) WATER SUPPLY TO WASHER BOX APPEARS TO BE LEAKING @ PEX TO COPPER CONNECTION. |
|
| 02/21/2003 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000*HAD MEETING WITH PLBG. CONTRACTOR ON GAS SYSTEM | |
| 02/14/2003 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999* 1.) APPROVED DRAWING SHOWS 80' OF DEVELOPED LENGTH BUT ACCUAL DEVELOPED LENGTH IS LONGER RE CALCULATE DEVELOPED LENGTH AND BTU TO CFH DEMAND AND GET A REVISED & APPROVED DRAWING SHOWING. THE INCREASE OF LINE THAT WILL BE REQUIRED. 2.) HAVE BTU & CFH. DEMAND CALC. OUT ON APPROVED DRAWING. |
|
| 01/30/2003 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999*1.) GAS LINES ARE NOT TO APPROVED DRAWINGS. 2.) SOIL WATER TEST IS OK 3.) OVERHEAD WATER DISTRIBUTION IS OK 4.) IF GAS METER HAS BEEN RELOCATED THEN A REVISED & APPROVED PLAN WILL BE NEEDED PRIOR TO NEXT INSPECTION. |