Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2003 | ENGINEERING - FINAL | Approved | ||
| 03/03/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. COMPLETE THE FOLLOWING FOR PERMANENT C OFO 1. PROVIDE AT LEAST 39 PARKING SPACES. 2.STRIPE LOADING ZONE. 3. REMOVE ALL CONSTRUCTION MATERIALS AND DEBRIS. 4.BARRICADE ALL AREAS WHERE CONSTRUCTION IS OCCURRING TO PREVENT PEDESTRIAN ACCESS. |
|
| 02/28/2003 | ENGINEERING - FINAL | Denied | THIS SITE IS NOT READY FOR INSPECTION. |