Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2003 | PLUMBING - ABOVE CEILING | Approved | IVRS - Inspection 0000* | |
| 01/09/2003 | PLUMBING - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000* 1.) RAIN LEADER WATER TEST IS OK FOR SOUTH SIDE OF B-3. |
|
| 12/23/2002 | PLUMBING - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*1.) 4" ABS RWL ON EAST AND SOUTH SIDE 2PLACES OK WATER TEST OK OK TO COVER. |
|
| 12/18/2002 | PLUMBING - ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*1.) ROOF DRAINS AND OVERFLOW DRAINS MUST BE RUN INDEPENDENTLY OF EACH OTHER. AFTER CONTRACTOR WAS NOTIFIED HE COMPLETED THE COLUMNS ANYWAYS. | |
| 12/12/2002 | PLUMBING - ABOVE CEILING | Not ready for Inspection | 1.) LOT 10-2" SCOTCHCOAT U.G. OK OK PRESSURE TEST OK OK TO COVER 2.) 94 UPC APPENDIX "D" D-1 MATERIALS ROOF DRAINS AND OVERFLOW DRAINS TO BE RUN INDEPENDENT OF EACH OTHER. |