Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T02CM04011
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/05/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*/ 1) PLUMBING FINAL (SHELL) OK, T.I. AND TENTATIVE T.I. ON OTHER PERMITS. 2) OK FOR C OF O PENDING ANY OTHER INSPECTIONS. | |
07/28/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) PROVIDE PERMITS/PLAN FOR THIS BLDG | |
07/18/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*/ 1) CPVC WATER PIPING REQUIRES A STICKER " THIS BLDG HAS NON-METALLIC WATER PIPING " IN THE ELECTRIC SERVICE PANEL 2) A TRAP ARM MAY ONLY CHANGE DIRECTION 90 DEGREE WITHOUT AN ADDITIONAL CLEANOUT | |
07/16/2003 | PLUMBING - FINAL | Denied | 1) CUT DOWN AND INSTALL CLEANOUT PLUGS ON ALL EXTERIOR GRADE CLEANOUTS PER PLAN 2) INSTALL COUNTER SINK TAPPED CLEAN-OUT PLUG WITH CP COVER AND APPROVED SCREW ON ALL EXTERIOR WALL CLEAN-OUTS 3) PROVIDE DETAIL THAT APPROVES INSTALLATION OF "SHEEPS TONGUE" AT NORTH SIDE OF BLDG 4) INSPECTION TERMINATED. HAVE PLUMBER WALK THROUGH JOB AND COMPLETE LIST BEFORE CALLING FINAL |