Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T02CM03980

Parcel: 141013490

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Permit Number - T02CM03980

Inspection Description - BUILDING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
07/25/2003 BUILDING - FINAL Approved IVRS - Inspection 0000*
07/23/2003 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) FROM LAST INSPECTION SECURE LIQUID TIGHT AT DISCONNECT . FURN (2) LABEL 29 AMP CIR. AMPACITY, MAXIMUM FUSE 30/30, 20 AMP FUSES INSTALLED 20 AMP MAXIMUM WRITTEN ON DISCONNECT, LABEL ON UNIT CIRCLED 30/30 3) NEED GAS BOND CLAMP
07/21/2003 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000* 1) NEED A PERMANANT ADDRESS #. 2) GAS VALVE 3 PLUG KIT RANGE.3) 90 DEGREE ELBOWS FOR T3P CONDENSTATE. 4) SECURE LIQUID TILE(FURNACE ROOM ) AT DISCONNECT.5) NEED ELET HOOK UP WATER HEATER.6)DISPOSAL, INSTALL UNIT. 7) EXPOSE GTA BOND CLAMP. 8) PUT THE FACTORY LABEL FOR HT STRIP ON THE UNIT.