Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2003 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection 0000*1.) BLDG SEWER OK OK TO TIE IN TO EXISTING WATER TEST OK 2.) ABS DWV UNDERSLAB OK WATER TEST ONE RISER TO TEN FEET OK OK TO COVER. 3.) WATER SERVICE NOT INSTALLED PER PLAN 4.) NOTE SEE DETAIL #3 ON A2 ELEVATION OF WATER HEATER AND REFER TO 511.2 94UPC. |
|
| 01/17/2003 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection 0999* 1.) SEE SECTION 712.2 94 UPC SECTIONAL WATER TEST 2.) SEE TABLE 7-6 SIZE OF REQUIRED CLEAN OUTS 3.) READ GENERAL PLUMBING NOTE #3. 4.) SHORT SECTIONS REPLACED BECAUSE OF DAMAGE SHALL BE OF THE SAME MAT'L TYPE AS EXISTING. 5.) SEE 101.4.1.3. REPAIRS AND ALTERATIONS. |