Inspection History Details
Inspection Status: Partial Approval
Inspection History: FRAMING
Permit Number - T02CM03770
Inspection Description - FRAMING
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/16/2002 | FRAMING | Partial Approval | IVRS - Inspection 0000*/ 1) PROVIDE TOP OUT TEST AT PLUMBING | |
10/16/2002 | FRAMING | Approved | ||
10/08/2002 | FRAMING | Denied | IVRS - Inspection 0999*/ 1) BLOCK 3 SIDE DEFFUSER (MECH) 2) WATER TEST DWV SYSTEM 3) SECURE PEX WATER LINE MINIMUM 12" FROM FLU PIPES 4) SECURE WIRES MINIMUM 12" FROM FLU PIPES 5) NO WATER/AIR TEST WATER SUPPLY PIPING 6) STOPPED INSPECTION COMPLETE ALL TRADES AND RECALL | |
09/25/2002 | FRAMING | Not ready for Inspection | IVRS - Inspection 0000*/ 1) NOT READY FOR INSPECTION | |
09/23/2002 | FRAMING | Not ready for Inspection | IVRS - Inspection 0000* |