Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/22/2002 |
ELECTRIC - INTERMEDIATE |
|
Approved |
|
| 10/18/2002 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000*1.) FINISH STRAPING AND SUPPORTING CONDUITS AND SEALTITE. 2.) PLEASE FILL ALL UNUSED OPENINGS. 3.) CONVAYOR/BAILER (HRB) CONNECTIONS NEED TO BE REPAIRED 480V WITH LOOSE FITTINGS AND EXPOSED CONDUCTORS SEAL UNUSED OPENINGS FOR WATE TITE. 5.) CONDUIT TO BE SEATED FULLY INTO FITTINGS 6.) FINISH PULLING WIRE TO ALL EQUIPMENT 7.) PLEASE CLEAN SURFACES UNDER LUGS AND GROUND BARS. |
| 10/17/2002 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000*1.) SUPPORT SEALTITE AS PER CODE AND TIGHTEN LOOSE FITTINGS 2.) WE HAVE MUTIPOLE TERMANATIONS AT GROUND BAR IN JUNCTION BOX. 3.) A BOND BUSHING IS NEEDED AT CONCENTRICS FOR 480 V CONDUCTORS. 4.) SUPPORT CONDUITS WITH IN 3' OF BOXES 5.) PLEASE VERIFY LISTING FOR CONVEYOR EQUIPMENT. |