Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2003 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection 0000*SOIL WATER TEST IS OK OVERHEAD WATER DISTRIBUTION IS OK 3.) GAS PRESSURE TEST IS OK 4.) OK FOR DRYWALL. |
|
| 03/11/2003 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000* Not ready for inspection. |
|
| 01/23/2003 | PLUMBING - INTERMEDIATE | Denied | 1.) MUST STRAP DOWN DOWN 3/4 GAS STUBB FOR GAS PACK ON ROOF. 2.) MUST SUPPORT 2" VENT HORIZONTAL FOR WATER CLOSET. 3.) SHOWER STALL NOT INSTALLED OR IS THIS A TILE SHOWER. 4.) NO ROOF JACKS ON 5.) NO CLOSET RINGS MAIN BATH. |