Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/27/2002 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000* |
| 08/23/2002 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) NEED 1/4" PITCH PER FT SOIL TRUNK AND SEWER 2) INSTALL TUB ON IT'S OWN DRAIN LINE, SUPPLY CLEANOUT AT EXTERIOR WALL 3) FLAT VENT TOILET COME OFF 3" TRUNK WITH AT 45" AND 1/8" BEND, OR COMBO FITTING, TO WALL 12" CENTER CLOSET BEND FLANGE TO FINISH WALL, WITH 2" PIPE 4) REVENT FOR LAV HT 42" ABOVE FIRST FLOOR |