Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2003 | ELECTRIC - FINAL | Approved | IVRS - Inspection 0000* | |
| 01/03/2003 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999*SCREWS STILL MISSING AT FRONT UNITS COVER AT SUB PANEL AS DISCUSSED? | |
| 01/02/2003 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*1.) PROPERLY APPLY ANTI OX PASTE AROUND ALL OF THE CONDUCTOR AT TERMINATION 2.) ISOLATE NEUTRAL & GROUNDING CONDUCTORS AT THE SUB PANEL ( INSTALL SCREWS FO RTHE FRONT COVER TOO. |
|
| 12/20/2002 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999* 1.) PLEASE PROVIDE MANFACTURES PAPERWORK FOR LUG KIT IN PANEL #1. 2.) USE AN APPROVED FILLER BLANK. 3.) WE HAVE DAMAGED ALUM, CONDUCTORS, ALSO MANUFACTURES STATES CAN NOT "RING" CONDUCTORS. 4.) USE APPROVED FITTING AT LB AND TIGHTEN LOOSE FITTINGS. 5.) CORRECTLY REMOVE OLD LABELING TAPE OVER NOT APPROVED 6.) COUNTER TOP RECEPTICALE TO BE GFI PROTECTED 7.) PROTECT CABLE BEHIND BATH LIGHTS 8.) BATH OUT LETS TO BE WIRED AS PER 210-8. 9.) FILL UNUSED OPENING IN PANEL #1 AND PLEASE LABEL COVER. 10.) FINISH ROOF. |