Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 11/06/2002 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 11/05/2002 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) NOT READY PER MIKE |
| 11/04/2002 |
FRAMING |
|
Denied |
IVRS - Inspection 0950*/ 1) POST BASES ARE MISSING THROUGHOUT HAVE ENGINEER OF RECONNECT PROVIDE DOCUMENTATION IF ONLY TWO POST BASES ARE REQUIRED ON ALL POSTS INDICATED ON S2.1 AND FRAMING PLAN REQUIRE POST BASES AND PROVIDE APPROVED REPAIR IF ALL REQUIRED 2) HOLDOWNS MISSING AT INTERIOR SHEARWALLS 3) ANCHOR BOLTS MISSING THROUGHOUT 4) HOUSES MUST BE LATHED FOR INTERMEDIATE INSPECTION, YOU WERE NOTIFIED 10/28/02 5) STOPPED INSPECTION, SUPERINTENDENT MUST INSURE HOUSE IS COMPLETE AND READY FOR INSPECTION PRIOR TO CALLING FOR INSPECTION, YOU MAY BE CHARGED RE-INSPECTION FEE FOR ANY FUTURE FAILURES |
| 11/01/2002 |
FRAMING |
|
Denied |
IVRS - Inspection 0950*/ 1) CANNOT INSPECT INTERMEDIATE ITEMS, UNTIL LATH HAS BEEN INSTALLED AND APPROVED |
| 10/28/2002 |
FRAMING |
|
Denied |
IVRS - Inspection 0950*/ NOTE: WE NO LONGER INSPECT INTERMEDIATES PRIOR TO LATH APPROVAL 1) POST BASES MISSING SEE PAGE S2-NOTE 15 2) HOLDOWNS NOT INSTALLED AT INERIOR 3) STAIRS DO NOT COMPLY WITH IRC SECTION 314 FOR RISE OR RUN 4) STOPPED INSPECTION |