Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2003 | ENGINEERING - FINAL | Approved | ||
| 04/28/2003 | ENGINEERING - FINAL | Approved | ||
| 02/27/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. PROVIDE 12:1 SLOPES ON HANDICAP RAMPS AND AT DRAINAGE CROSSINGS ON THE EAST SIDE OF THE BUILDING (RAMP OVER DRAINAGE PIPES ARE IN AN AREA THAT WILL BE UTILIZED BY HOST PERSONNEL ONLY). 2. RAIN GUTTERS FOR ROOF OVERHANGS WILL BE NEEDED IN AREAS ALONG THE NORTH SIDE OF BUILDING. 3.TRASH DUMPSTER ENCLOSURE HAS NOT BEEN CONSTRUCTED PER DEVELOPMENT STANDARDS. ENCLOSURE REQUIREMENTS INCLUDE BOLLARD POST INSIDE CLOSURE AND GATES. |
|
| 11/14/2002 | ENGINEERING - FINAL | Partial Approval | TEMPORARY/PARTIAL C OF O APPROVED PENDING COMPLETION OF TRASH ENCLOSURE, AND APPROVED REVISION DRAWINGS TO SHOW (2) ENTRANCES FROM ORACLE ROAD, AND VERIFICATION/CERTIFICATION OF ELEVATIONS. PROVIDE TEMPORARY BARRIERS IN LIEU OF STAIRWELL AND RAMP HANDRAILS. BARRICADE OR FILL FENCE POST HOLES. |
|
| 11/13/2002 | ENGINEERING - FINAL | Denied | THIS SITE IS NOT READY FOR INSPECTIONL. |