Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/24/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* | |
| 10/01/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) ALL REQUIRED INSPECTIONS MUST BE APPROVED BEFORE CALLING FINAL. 2) NO TEST ON GAS - HORIZONTAL BRANCHES TO BE SUPPORTED. 3) HAVE YARD WATER PIPING ADDED TO PERMIT AND EXPOSE ALL YARD WATER PIPING. 4) PUMP BEHIND EWC NOT SUPPORTED MAY NOT INTERMINGLE ABS AND PVC. 5) INSPECTION TERMINATED - HAVE PLUMBER REVIEW PLUMBING NOTES AND INSTALL PER PLAN. | |
| 06/26/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* 1( PROVIDE INSPECTINON HISTORY FOR APPROVAL OF ALL REQUIRED INSPECTIONS, OR EXPOSE WORK FOR INSPECTION. 2) EWE PLUMBING OK, OK TO COVER . | |
| 06/25/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* | |
| 04/24/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* 1.) PROVIDE INSPECTION HISTORY FOR 03040 PLUMBING YARDWATER. 2.) THE AGGREGATE CROSS SECTIONAL AREA OF VENTING DOES NOT EQUAL THAT OF THE LARGEST REQUIRED BLDG. SEWER. 3.) WATER COOLER PLUMBING COVERED BEFORE INSPECTION. 4.) COULD NOT LOCATE REVISED APPROVED PLAN AS REQUESTED ON 12/10/02. 5.) PLEASE KEEP PERMIT ON SITE. |