Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 02/07/2003 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 02/04/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) THE DRAIN WASTE AND VENT SYSTEM MUST BE TESTED TO A HEIGHT OF 10' WITH WATER 2) THE COMBUSTION AND RELIEF AIR DUCTS FOR FURNACE MUST BE FULL SIZE THROUGH THE ROOF |
| 01/31/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) NO PRESSURE TEST ON GAS YARD LINE ( INTERIOR GAS TEST OK) 2) DWV SYSTEM MUST HAVE 10' WATER TEST 3) LOOSE END OF 4 GANG ELECTRIC BOXES MUST BE SECURED 4) FRAMING CANNOT BE APPROVED WITHOUT APPROVAL OF ALL OTHER INTERMEDIATE INSPECTIONS 5) COMBUSTION/RELIEF VENTS AT FURNACE ROOM MUST EXTEND FULL SIZE THROUGH ROOF |