Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 09/04/2002 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 09/03/2002 |
FRAMING |
|
Denied |
IVRS - Inspection 0105*/ 1) SITE PLAN/EXCAVATION NOT APPROVED STOP CONSTRUCTION UNTIL APPROVED |
| 08/23/2002 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) MISSING NAILING ON SHEAR CHECK ALL HORIZONTAL AND VERTICALS 2) NEED SAFETY GLASS FIXED PANEL REAR PORCH IF SLIDING PORTION OF DOOR IS ON THAT SIDE 3) ANCHOR BOTTOM PLATE AT SLIDING DOOR 4) BLOCK ALL MECHANICAL 5) SHEARWALLS TO GO TO ROOF DECK, UNLESS ENGINEERING SHOWS OTHERWISE 6) TRUSSES AT REAR PORCH, SEE PLAN NEED 1/2" GAP AT BOTTOM CHORD 7) CHECK WASHER TRAP ARM FOR OSB STAPLES, INSTALL BANG PLATE FOR STUCCO LATH 8) FINISH DOOR FRAMING LAUNDRY DOOR 9) INSTALL WATER HTR PLATFORM 9) FIREPLACE CHASE FRAMING NOT COMPLETE 10) MISSING BACKING AT TUBS 11) DAMPERS MISSING ON EXHAUST FANS 12) CUT BATHROOM THRESH HOLD, SECURE BOTTOM PLATE 13) CLOSET FLANGE 15" MINIMUM FOR SHOWER 14) ALL SOUTHWEST A.B. 24" ON CENTER 15) FIREPLACE CHASE ON ROOF STUDS AT 24" ON CENTER 16) PARTIAL APPROVAL FOUNDATION INSPECTS 17) OK DWV WATER TEST 18) GAS TEST HOLDING PRESSURE |
| 08/13/2002 |
FRAMING |
|
Denied |
1) CALL BACK FOR FRAME AND ALL INTERMEDIATES AT SAME TIME. ALL TRADES TO BE COMPLETED BEFORE FRAME IS INSPECTED 2) NO ELECTRICAL, NO WATER TEST ON DWV'S, NO MECHANICAL INSTALLED |