Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2003 | ENGINEERING - FINAL | Approved | ||
| 03/13/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O ONLY. COMPLETE THE FOLLOWING: 1. CONSTRUCTION MATERIAL AND DEBRIS REMOVAL FROM (2) SOLID WASTE TRASH ENCLOSURES, RETENTION/DETENTION BASIN, AND EXISTING DRAINAGE CHANNELS. 2. WEIR OUTLET STRUCTURE CONSTRUCTED PER GRADING PLAN DETAILS: A-A, L AND K SPECIFICATIONS. 3: ADDRESS PONDING WATER IN THE RETENTION/DETENTION BASIN AND PROVIDE 3:1 SLOPE ON EAST END OF BASIN. 4. PROVIDE CLASS I BICYCLE PARKING SPACES PER GRADING PLAN DETAIL G-4 |
|
| 11/29/2002 | ENGINEERING - FINAL | Partial Approval | APPROVED FOR TEMPORARY C OF O. FINAL NOT TO BE GIVEN UNTIL GRADING INSPECTION 9190 FOR GRADING PERMIT T02BU00944 HAS BEEN COMPLETED AND APPROVED. |