Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/25/2002 |
PLUMBING - ROUGH, SOIL |
|
Approved |
|
| 08/17/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) SOIL WATER TEST IS 2.) P.O.C. OF NEW BLDG DRAIN TO EXSISTING BLDG. DRAIN IS OK 3.) NOTE: HORIZONTAL WASTE LINE MUST BE ON A FIRM BED. NO BRIDING ALLOWED. 4.) OK TO BACKFILL TRENCH. |
| 08/09/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
1.) SOIL WATER TEST IS OK 2.) P.O.C. OF NEW BLDG DRAIN TO EXSISTING BLDG. DRAIN IS OK 3.) THIS INSPECTION IS FOR RM #211,251 ONLY 4.) OK TO BACKFILL TRENCH. |
| 08/07/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR CM 255,257,259,261,263 ONLY 3.) OK TO BACKFILL TRENCH.. |
| 07/30/2002 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection 0000* HAD PER CONSTRUCTION MEETING WITH PLBG. CONTRACTOR ON STRUCTRUAL CONDITION. |