Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
Permit Number - T02CM02296
Inspection Description - ELECTRIC - TEMP POWER FOR TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/25/2003 | ELECTRIC - TEMP POWER FOR TEST | Approved | ||
08/13/2003 | ELECTRIC - TEMP POWER FOR TEST | Denied | IVRS - Inspection 0999*/ LETTER DOES NOT CLARIFY WHAT WAS REQUESTED IN SAYING ALL POWER TO FUEL DISPENSERS AND FUEL PUMPS BEING DISCONNECTED DOES NOT NECESSARILY DISCONNECT ALL POSSIBLE STRAY VOLTAGES, LOW VOLTAGES. PLEASE CLARIFY ALL POSSIBLE BACK FEED REMOVED ONCE EMERGENCY POWER ACTIVATED. | |
08/11/2003 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | IVRS - Inspection 0000*/ 1) PENDING LETTER. SEE ITEM #4-8/7/03 INSPECTION | |
08/07/2003 | ELECTRIC - TEMP POWER FOR TEST | Denied | IVRS - Inspection 0245*/ 1) NOTES: BOND BUSHING REQUIRED AS PER NEC 514-16 AND 501-16 2) LOCKNUTS TO BE SEATED PROPERLY WITH TEETH OF LOCKNUT IN INTIMATE CONTACT WITH ENCLOSURE (ELECTRICAL EQUIPMENT CABINET) 3) COMPLETE SIGN OFF SHEET AND BOND MUST BE POSTED FOR TEMP POWER FOR TEST 4) PROVIDE LETTER FROM OR STAMPED BY ELECTRICAL ENGINEER TO VERIFY EM. SHUT OFF DISCONNECTION OF ALL ELECTRICAL EQUIPMENT ASSOCIATED WITH DISPENSING PUMPS NEC 514.6 |