Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
Permit Number - T02CM02284
Inspection Description - ELECTRIC - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2004 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection 0000*/ 1) SPRINKLER PIPING ABOVE PANEL LHN OK TO COVER. 2) OK WALLS SOUTH WING INCLUDES ALL ROOMS. 3) WATER AND GAS BONDS OK TO COVER NORTH BLD AND SOUTH BLD. 4) STRUCTURAL , COMMUNICATIONS ROOM SOUTH BLD. ALL ABOVE OK TO COVER. | |
01/26/2004 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*/ SPRINKLER PIPING IN DEDICATED SPACE ABOVE PANEL LHN. | |
01/21/2004 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*/ TWO 4" AND ONE 2" CONDUIT FOR COMMUNICATION. ONE 3/4" PVC F.A. BETWEEN BLDGS. NORTH BLDGS EXTERIOR WALLS INTERMED APP. | |
12/18/2003 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*/ PLUS UNDERGROUND FOR QWEST COMPLETE. | |
12/09/2003 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*/ 1) UNDERGROUND PARTIAL 2) UFER 3/0 COPPER 2 RODS 6' APART 3) COMMUNICATIONS 2-4" 12" PVC WEST SIDE OF POOL TO EAST SIDE 2) AT SWITCH GEAR PAD 2-4" PVC'S TO NEW BLDG, 3-3" PVC'S FOR FUTURE, 1-2 1/2" PVC TO POOL, 2-3" PVC'S TO BASKET BALL COURT AND 4-4" PVC'S INTO TRANS TEP | |
12/03/2003 | ELECTRIC - INTERMEDIATE | Partial Approval | 2 - PARALLEL 4" FEEDER FROM SERVICE AREA TO MAIN BUILD APP. 3/4" FROM SES AREAS TO PULL BOX AND OUT TO MAIN BUILD - APP. | |
12/02/2003 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*/ BLD OUT 160 FEET 4 CONDUITS EAST. 3-4" PVC AND 1-2" PVC - TELE AND COMMUNICATION. OK TO COVER. | |
11/20/2003 | ELECTRIC - INTERMEDIATE | Partial Approval | FOR [4] POLES AND UFER. |