Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2003 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection 0000* | |
| 11/06/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* COL FOOTINGS IN COURT YARD | |
| 10/30/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*/ STEM WALLS COMPLETE. | |
| 10/28/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* 7 EACH INTERIOR COL FOOTINGS | |
| 10/08/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* F1 CONTINUOUS FOOTINGS S. 1/2 OF BLDG. | |
| 10/02/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* F1 CONT FOOTINGS N 1/2 OF BLDG. NOTE: AN ELEC INSP IS REQUIRED TO OK UFFER'S. NOTE #2: AWG CU ATTCHED WITH UL LISTED CONNECTORS ON N. SIDE OF BLDG. #2 WIRE IS FOR TRANSFORMER GROUND. AN ADDITIONAL #2 WIRE FOR GAS PIPE BONDING AT SAME LOCATION.(#6 REQUIRED) REF: PP E2.1 AND E8.2 |
|
| 09/30/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*/ 1) SETBACK INSPECTION |