Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 08/20/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 08/13/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999*/ 1) SOUTH SIDE GARAGE FRONT #3 SHEAR PANEL MUST EXTEND FROM HOLDOWN TO HOLDOWN ONE BROKEN 2) GARAGE SOUTH WEST CORNER #1 SHEAR APNEL REQUIRES 1/2" AB WITHIN 12" OF PLATE END 3) EAST 6060 WINDOW RACKED 4) OSB ROOF SHEATHING MUST SPAN 2 BAYS, (3 TRUSSES) REPLACE ALL SHORT PANELS 5) TECO TESTED OSB ROOF SHEATHIN IS DELAMINATING. HAVE A WOOD PRODUCTS ENGINEER PROVIDE A WRITTEN CERTIFICATION MEETING REQUIRED STANDARDS DUT TO EXPOSURE TO WEATHER 6) ROOF SHEATHING NOT SUPPORTED ON ONE EDGE ABOVE BATH AT VAULT |