Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 06/20/2002 |
BUILDING ABOVE CEILING |
|
Approved |
IVRS - Inspection 0000* |
| 06/17/2002 |
BUILDING ABOVE CEILING |
|
Denied |
IVRS - Inspection 0999*1.)RE FASTEN INSULATION WHERE IT HAS DROPPED OUT OF ROOF CAVITIES. 2.) CIELING GRID DOES NOT MEET CISCA INSTALLATION STANDARDS NOR UBC INSTALLATION STANDARDS. IE: CISCA DOES NOT NOT ALLOW POP RIVETS FOR ALIGNMENT PURPOSES. THE CIELING NEEDS TO FLOAT IN PLACE: OR UBC ALLOWS POP RIVETS BUT YOU MUST USE HANGERS WITHIN 8" OF PERIMETER ON ALL MAIN AND CROSS RUNNERS. |