Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/08/2002 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000* |
| 07/09/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) LOCKER ROOMS READY FOR CONCRETE. 2.) NO REVISION FOR SINK IN KITCHEN 3.) SEWER/HCS NOT READY FOR INSPECTION. |
| 07/08/2002 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection 0000*1.) REVISE PLAN TO INCLUDE HAND SINK IN KITCHEN DO NOT POUR THSI AREA UNTIL APP. PLAN IS ON SITE AND INSPECTED 2.) NEED TO SEE FLOOR DRAINS, SINKS AND TRAP PRIMERS PRE-POUR. |
| 07/03/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1. N/H DWV UNDERGROUND IN LOCKER RMS. OK WATER TEST ONE RISER TO TEN FEET OK. 2.) OK TO BACKFILL. 3.) PLEASE CALL FOR A PRE-POUR. |
| 07/01/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000* |