Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 07/12/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 07/03/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999*SEE 7-27 ITEMS 2 X 3 |
| 06/27/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) PLAN CALLS FOR 6" X 10" R/SAWN BEAM AT GARAGE OPENING SOUTH WALL 6" X 8" INSTALLED 2) MISSING SW3 AT GARAGE WEST WALL, SW4 AT FRONT WALL, WASHERS MISSING HD5A=SW4 3) NO DETAIL ON PLAN SHOWING I JOIST SUPPORTING 2ND FLOOR WHEN 1ST FLOOR JOISTS ARE PARALLEL TO WALL ABOVE 4) NAILING OF SHEAR WALLS SW4 10D'S AT 4" ON CENTER, SW6 8D'S AT 4" ON CENTER 5) MISSING WIND BRACING THRU-OUT 6) FINISH NAILING ALL SHEARWALLS 7) ROOF NAILING MISSING UNDER FRONT EAST CRICKETS (PERIMETER, LOWER ROOF STAPLES NOT TIGHT ROOF SQEALS 8) WALL BUILT ON TOP OF LOWER WALL, 2ND FLOOR REAR BEDROOM TIE TOGETHER AT PLANT COMMON) 9) HOLE FOR FIREPLACE FLUE NOT LARGE ENOUGH |