Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T02CM01462
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2002 | ELECTRIC - FINAL | Approved | IVRS - Inspection 0000* OK TO CLEAR. | |
07/15/2002 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0210*THE FOLLOWING CORRECTION TO THE CORRECTIONS TO THE ELECTRICAL SERVICE EQUIPMENT ARE REQUIRED. 1.) INSTALL GROUNDING BUSHINGS TO THE CONDUIT NIPPLES IN THE C.T. CAN TO GUTTER. THE HUB SIDE IS OK 2.) INSTALL GROUNDING BUSHING ON THE PIPE NIPPLE FROM MAIN SERVICE DISCONNECT TO GUTTER. HUB IS OK. NEC ART 250 REQUIRES BOTH SIDE OF PIPE NIPPLE OF SERVICE EQUIPEMENT ENCLOSURE BE BONDED ON BOTH ENDS. CORRECT & RECALL INSPECTION. PLEASE CONTACT A PERMIT COUNTER CLERK REGARDING THE POSTING OF A TEMPORARY FUEL & POWER TESTING BOND THIS MAY BE REQUIRED BY COT DSD 791-5550. PRIOR TO RELEASE AND NOTICE TO TEP TO CONNECT ELECTRIC SERVICE. THANK MAC. |