Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/19/2003 |
BUILDING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 06/18/2003 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999* INSTALL DOUBLE WALL FLUE PIPE WATERHEATER & MAINTAIN UPWARD FLOW. 3"CLEARANCE BELOW WATERHEATER PTR LINE TERMINATION COMPLETE OTHER ITEMS LISTED 1-17 ABOVE SUBMIT AS BUILT PLANS FOR APPROVAL. |
| 06/16/2003 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) A/C NOT ON ELECTRIC PANEL SCHEDULE 2) DEDICATED GARAGE AND OUTSIDE 220 CIRCUITS NOT ON ELECTRIC PANEL SCHEDULE 3) NEED INSULATION CARD 4) INSTALL GAS COCK RANGE AND CAP OFF, IF USING ELECTRIC RANGE 5) WATER HEATER INSTALLATION INCOMPLETE 6) VERIFY COMPLETE INSTALLATION OF GREEN BOARD AT ALL BATHS 7) SEAL HOLES FURNACE PLATFORM 8) POST ADDRESS ON HOUSE 9) MAXIMUM 35 AMP BREAKER A/C 10) VACCUM BREAKERS HOSE BIBS 11) COMPLETE PLUMBING SINKS 12) A/C INSTALLED INSTEAD OF ONE 13) SEAL AROUND OPENING EXTERIOR A/C LINES 14) INSTALL A/C REGISTERS 15) ELECTRIC OUTLET REQUIRED END OF PENINSULA KITCHEN 16) CANNOT HAVE EXPOSED BULBS CLOSETS 17) ADJUST GARAGE DOOR TO SELF CLOSE |