Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/01/2002 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 04/30/2002 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000* |
| 04/24/2002 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*1.) IF NO BOND POSTED FOR TEMP POWER THEN AFTER FINAL APPROVAL OF MECH AND PLUMBERING AND OK FROM BLD INSPECTOR, A RELEASE FOR POWER CAN BE ISSUED. RE CALL FOR ELECTRIC FINAL WHEN ALL THE ABOVE IS COMPLIED WITH. |
| 04/23/2002 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0245*1.) ALL DEVICES TO BE PIGTAILED TO BOXES PER 250-148A,370-40D N.E.C. 2.) SECURE 2 X 4 LAY IN LIGHT FIXTURES TO GRID WITH #8 SCREWS OR BEND OUT CLIPS ON FIXTURES 3.) SUPPORT EMT CONDUIT WITHIN 3' EACH BOX PER 348-13 NEC. |