Inspection Status: Not ready for Inspection
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/31/2010 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 11/15/2002 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) TEMP, PRESS RELIEF LINE FIND TERMINATION 2) VENTING FOR BATHROOM CAN ONLY LOCATE ONE 1 1/2" VENT NEAR THE BATHROOM 3) 2 WAY CLEANOUT HOW IS BLDG DRAIN PLUMBED TO SEWER 2 CLEANOUTS IN REAR YARD 4) GAS LINES ARE TO BE 6" ABOVE GROUND 5) OUTLET SPACING NOT CORRECT 6) FRONT PORCH RAFTERS NOT CONNECTED WITH PROPER HARDWARE ALSO BEAMS TO COLUMNS 7) AIR VENTS COVERS, FOR EXHAUST FANS PLUGGED WITH ROOFING MATERIAL 8) SMOKE DETECTORS REQUIRED IN BEDROOM |