Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T02CM01282
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/03/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*/ 1) PLUMBING FINAL IS OK 2) OK FOR C OF O | |
09/01/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*/ DOOR WAS LOCKED. | |
08/29/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*/1) MUST CONNECT FLU VENT FOR WATER HTR. AND PROVIDE 1" CLEARANCE AROUND DOUBLE WALL. 2) MUST HAVE T&P DRAIN GRAVITY FLOW TO RECEPTOR WITH NO TRAPPED WATER. 3) MUST SECURE EXPANSION TANK. 4) MUST INSTALL GAS LINE AS PER PLAN AND PROVIDE AIR TEST. 5) MUST INSTALL ALL BACKFLOW PREVENTORS FOR CARBINATED WATER AND TESTED AND CERTIFIED. 6) MUST RUN CONTINUOUS WASTE INDEPENDANT WHEN COMPARTMENTS EXCEED 30".7) MUST REMOVE TRAP FOR GREASE WASTE. 8) INSTALL WASTE AND SUPPLY WRAPS FOR ADA. 9) MUST PAINT VENTS THEN ROOF WITH LATEX PAINT. 10) MUST PROVIDE SAFTY CABLES FOR ALL APPLIANCES WITH COASTERS. 11) GAS SYSTEM WORK MUST BE DONE BY LICENSED PLBG CONTRACTOR. |