| 08/09/2002 |
PLUMBING - SEWER HCS CONNECT |
|
Approved |
|
| 08/02/2002 |
PLUMBING - SEWER HCS CONNECT |
|
Partial Approval |
IVRS - Inspection 0000* 1.) GAS PRESSURE TEST IS OK 2.) NOTE: THIS INSPECTION IS FOR GENERATOR FOR LIFT STATION ONLY 3.) BTU & DEMAND HAS BEEN APPROVED BY HOLY PIERCE. |
| 07/31/2002 |
PLUMBING - SEWER HCS CONNECT |
|
Partial Approval |
1.) 6" ABS VENT FOR LIFT STATION IS OK 2.) 1/2 AIR LINES OK 3.) NOTE: WILL REQUIRE A LETTER FROM ARCHITECH STATING THAT HE WILL ACCEPT ABS SCH 40 INSTEAD OF STEEL PIPE PRIOR TO NEXT INSPECTION 4.) OK TO BACKFILL TRENCH. |