Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 04/16/2002 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 04/10/2002 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) RE: BACK PATIO NOT COMPLETE THIS WAS ADDED AFTER HOUSE WAS POURED AND ALL OTHER TRADES WERE DONE |
| 04/09/2002 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) REMOVE SCREEN FROM DRYER VENT 2) REMOVE COMBUSTIBLES AWAY FROM FURNACE VENT FLUE 1" REQUIRED 3) EXHAUST FAN AT ALUNDRY ROOM NOT HOOKED UP 4) OK TO INSULATE REST OF HOUSE WILL NEED TO REINSPECT THESE THREE ITEMS BEFORE SHEET ROCK IS PUT ON 5) WILL APPROVE FRAMING WHEN ALL TRADES ARE COMPLETE |
| 04/05/2002 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) PROVIDE WATER TEST DWV 2) 1994 UPC SEC 1002.2 RE: TRAP ARM AT WASHER STAND PIPE 3) PROVIDE VENTING AT LAUNDRY ROOM 4) SHIM HEADERS THRU-OUT HOUSE 5) MOVE ELECTRICAL WIRES AWAY FROM CAN LIGHTS 6) EXHAUST FAN AT MASTER BATH MISSING FLAPPER 7) STOPPED INSEPCTION AT MASTER BATH AREA |