Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 09/06/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 09/04/2002 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) ROOF DECK: A.) ALL OSB TURNED WITH STRANDS PARALELL TO RAFTER TO BE BLOCKED B.) FRONT BEAM GABLE LOOSE JOINT OSB EASTSIDE C.) NEED TRUSS SHOP DRAWINGS BEFORE ROOF CAN BE LOADED 2) FRAMING: A.) ALL BEAMS TRUSSED REQUIRE METAL BRACKETS TO HOLD UNITS TOGETHER B.) GIRDER TO GIRDER CONNECTIONS TO HAVE HANGER AND CONNECTION REVIEWED BY ENGINEER SEE GIRDER TO GIRDER EAST SIDE OF ROOF C.) ALL HANGERS TO BE NOTED ON PLAN EASTSIDE HIP JACKS NOT ENOUGH SURFACE FOR HNAGER NAILS, ALL HOMES FILLED, MISSING DETAILS D.) PLANS MISSING CITY STAMPS E.) CHECK ALL HANGERS FOR CORRECT NAILS F.) FRONT ENTRY TRUSS NON-STRUCTUAL TYPE/REQUIRES CONTINOUS BEARING G.) MISSING GUSSET PLATE AT GIRDER GARAGE WALL H.) NEED HANGER SPECIFIED FOR HIP JACKS I.) STOPPED INSPECTION |