Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/18/2002 |
ROOF NAILING |
|
Approved |
IVRS - Inspection 0000* |
| 10/15/2002 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999*/ 1) ROOF: THERE ARE 4 PIECES OF OSB, ON TH UPPER ROOF, TAHT ONLY COVER ONE RAFTER BAY. 2 BAY COVERAGE IS THE MINIMUM, OR THE 2 UNSUPPORTED EDGES OF EACH PIECE, MUST BE BLOCKED (2X) UNDERNEATH AND NAILED OFF THROUGH OSB 2) FRAME: IF THE ANCHOR BOLT, AT THE EAST END OF THE SOUTH WALL IN THE FIREPLACE ROOM, CANNOT BE TIGHTENED, WITH RED HEAD MUST BE INSTALLED 3) MECH: THE 3 FLUE STABLIZER STRAPS MUST BE SECURED. THERE IS OSB, ABOVE THE FLUE CEILING COLLAR, THAT MUST BE CUT BACK FOR 2" CLEARANCE TO FLUE 4) FRAME: SHIM PATIO DOOR AND SOUTH WINDOW HEADER CRIPPLES |