Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T02CM00526
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/16/2002 | PLUMBING - INTERMEDIATE | Approved | 1.) SOIL WATER TEST OK 2.) OVERHEAD WATER DISTRIBUTION IS OK 3.) OK FOR DRYWALL. | |
09/17/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*OVERHEAD WATER DISTRIBUTION IS OK 2.) RAIN LEADER HANGERS OK 3.) OK FOR DRYWALL. 4.) NOTE: CLOSET RINGS HAVE NOT BEEN INSTALLED. | |
08/22/2002 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000*BLDG. DRAIN CONNECTION TO BLDG. SEWER IS OK 2.) YARD WATER LINE FINAL CONNECTION IS OK. | |
08/17/2002 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000*NOT READY FOR INSPECTION. | |
07/31/2002 | PLUMBING - INTERMEDIATE | Partial Approval | 1.) AIR PRESSURE TEST FOR SITE SEWER FROM M.H.#2. EAST TO C.O. # 1-C IS OK 2.) M.H. #3 EAST TO C.O. #12 & 14 TEST IS OK. | |
07/30/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*SOIL WATER TEST FOR 4" SITE SEWER TO CHEVERON PAD IS OK. 2.) NOTE MUST CHANGE HUSKEY BAND AND REPLACE WITH MISSION COUPLING @ P.L. | |
07/24/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1.) SITE SEWER FOR SHOP B AND DELI BAKERY INTERECEPTOR 2.) 4" SITE SEWER FOR CHEVRON PAD IS OK 3.) OK TO BACKFILL TRENCH. 4.) NOTE: WILL REQUIRE AIR PRESSURE TEST ON THESE SYSTEMS @ A LATER TIME. | |
07/23/2002 | PLUMBING - INTERMEDIATE | Denied | 1.) MUST PROVIDE AIR OR WATER TEST FOR 4" BLDG. SEWER FOR CHEVRON PAD. 2.) CAN NOT HAVE SINGLE TWO WAY C.O. FITTINGS WITH A EXTENTION ON RISER MUST USE DIRECTIONAL FITTINGS 3.) DO NOT COVER. | |
07/18/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1.) SITE SEWER FROM 4" FLOOR DRAIN EAST TO C.O. #1-C EAST TO C.O. #1-B NORTH TO C.O. #1-A WEST TO C.O. #4 IS OK 2.) OK TO BACKFILL TRENCH. | |
07/16/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* 1.) SITE SEWER FROM C.O. #4 UPSTREAM TO M.H. #2 IS OK 2.) OK TO BACKFILL TRENCH. | |
07/12/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1.) 6" SITE SEWER FROM M.H. #3 EAST TO 6" C.O. ONLY. 2.) OK TO BACKFILL TRENCH. 3.) NOTE: WILL VERIFY AIR PRESSURE TST OF 5LBS MIN @ A LATER TIME. |