Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/26/2002 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000* |
| 08/23/2002 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999*TRAP PRIMER IS REQUIRED FOR FLOOR DRAIN @ OUTDOOR EATING AREA. |
| 08/15/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
1.) 2" YARD WATER LINE FROM METER TO BACKFLOW PREVENTER AND BLDG. SERVICE IS OK. |
| 08/09/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
1.) FINAL CONNECTION TO ALL THOUGH DRAINS ARE OK. 2.) OK FOR CONCRETE. |
| 07/17/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) GREASE INTERCEPTORS HAVE BEEN INSTALLED 2.) OK TO BACKFILL |
| 06/21/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
1.) SOIL WATER TEST FOR 4' BLDG DRAIN @ COFFEE SHOP IS OK 2.) WILL REQUIRE A REVISED DRAWING SHOWING 4" BLDG. DRAIN TO COFFEE SHOP. PLBG. CONTRACTOR WILL RED LINE DRAWING ON THIS DRAIN. |
| 06/18/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR COMBINATION WASTE & VENT SYSTEM BETWEEN GRID LINE 7.2 THRU 3.) OK NORTH 4. 3.) OK TO BACKFILL TRENCH. 4.) MUST SEE TAIL PIECE AND FLOOR SINKS PRIOR TO CONCRETE. |
| 06/13/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR COMBINATION WASTE & VENT SYSTEM FOR FROZEN FOOD & FLORAL AREA ONLY. 3.) OK TO BACKFILL TRENCH. |
| 06/12/2002 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection 0000*NOT READY FOR INSPECTION. |
| 06/10/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR ROUGH PLBG. BETWEEN COLUMN D EAST TO H AND GRID LINE #1 SOUTH TO #3 ONLY 3.) ONLY TO BACKFILL TRENCH. |
| 06/07/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR U.G. ROUGH PLBG. FOR MEAT DEPT. ONLY 3.) AIR PRESSURE TEST FOR 2" WATER SERVICE BLDG. A SHOPS. 4.) OK TO BACKFILL TRENCH. |
| 06/05/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR 4" GREASE LINE ONLY 3.) OK TO BACKFILL TRENCH. |
| 06/04/2002 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999*1.) TRAP ARMS FOR 4" TD-1 MUST HAVE MIN DISTANCE FROM CROWN OF TRAP TO BARCEL OF RISER 2 TIMES THE PIPE DIAMETER. 2.) RETEST SYSTEM 3.) AIR PRESSURE TEST FOR 2" C.W. IS OK 2" C.W. IS STUBBED OUT OF BLDG. ONLY. |
| 05/24/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
GROUND PLUMB TO GRID D-10.5. |