Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/12/2002 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000*1.) AIR PRESSURE TEST FOR 4" BLDG. DRAIN IS OK 2.) OK TO BACKFILL TRENCH. 3.) NOTE: WILL REQUIRE A REVISED AND APPROVED DRAWING ON BLDG. DRAIN OUTLET FOR BLDG 1 ONLY BEFORE NEXT INSPECTION. |
| 06/04/2002 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*1.) AIR PRESSURE TEST ON 6" SITE SEWER FROM M.H. #2 TO 20' FROM SOUTH WEST CORNER OF BLDG. #1 IS OK 2.) OK TO BACKFILL TRENCH UP TO MANHOLE #1 ONLY. 3.) NOTE: M.H. #1 REQUIRES A FLEXABLE COMPRESSION JOINTS WITHIN 3' OF MANHOLE. |