Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 05/31/2002 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
IVRS - Inspection 0000* |
| 04/29/2002 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0105*/ 1) ALL FOOTINGS AND STEEL IS PER PLAN UFER INSTALLED EAST SET BACK IS 6 FT AND SHOULD BE NINE FOOT BUILD TO PLAN OR REVISE PLAN TO AS BUILT |
| 04/26/2002 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999*/ 1) TOILET NOT PROPERLY VENTED-TRUNK HEAL VENTING NOT ALLOWED 2) 3 TO 2" BUSHING NOT ALLOWED IN DRAIN LINE (VENT ONLY) 3) ABS PLASTIC SEWER LINE MUST BE AT LEAST 12" BELOW GRADE AT EXIT OF BUILDING 4) SEWER DRAIN CANNOT RUN PARALLEL TO FOOTING WITHIN 24" OF FOOTING 5) 2 WAY CLEANOUT NOT INSTALLED 6) YOU MUST PROVIDE A 10 FOOT HIGH WATER TEST OF ALL ROUGH PLUMBING 7) ALL SEWER DRAIN LINES MUST BEAR ON UNDISTURBED OR COMPACTED SOIL BRIDGING NOT ALLOWED 8) REBAR CANNOT BE IN CONTACT WITH SOIL -YOU MUST ISLOATE HORIZONTAL REBAR FROM VERTICAL SUPPORTS WITH NON METALIC ISOLATOR 9) PLAN CALLS FOR 9 FEET TO EAST SET BACK-ONLY 6 FEET EXISTS 10) FOUNDATION FOOTING WIDTHS NOT PER PLAN-STEEL NOT PER PLAN |