Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T02CM00172

Parcel: 12912130A


Addresses:

1101 E 30TH ST

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
06/24/2002 BUILDING - FINAL Approved IVRS - Inspection 0000*
06/21/2002 BUILDING - FINAL Denied IVRS - Inspection 0999*/ 1) ALL GAS VALVES MUST BE CAPPED
06/18/2002 BUILDING - FINAL Denied IVRS - Inspection 0999$/ 1) GFCI IN NORTH BATHROOM WILL NOT TRIP USING GFCI TESTER 2) CAULK AROUND THE BASE OF BOTH TOILETS 3) ROUND DUCT FOR FURNACE/COOLING MUST HAVE A MINIMUM OF 3 SCREWS AT EACH JOINT PRIOR TO TAPING 4) CANNOT USE FLEX PIPE ON WATER HEATER TPRV DISCHARGE LINE. MUST BE RIGID COPPER TYPE M OR EQUIVALENT SOFT COPPER ALSO NOT ALLOWED