Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2002 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*1.) PLUMBING FINAL OK. 2.) CORRECTIONS MADE OK OK FOR C OF O PENDING ANY OTHER INSPECTIONS. |
|
| 06/21/2002 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) A VACUUM BREAKER IS NOT INSTALLED UNTIL THE RETAINING SCREW IS BROKEN OFF 2.) THE TERMINAL END OF A T & P DRAIN MAY NOT BE THREADED SUPPORT DRAIN. 3.) NO CLEAN OUT ON SINK CLEAN OFF EXCESS SILICORE 4.) BATHROOM IS NOT TO ADA STANDARDS HAVE PLUMBER REVIEW STANDARD AND COMPLY. | |
| 06/07/2002 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*INSPECTION IS FOR # ONLY. 1.) HOSE BIBBS REQUIRE VACUUM BREAKERS 2.) WATER HEATER OT RATED FOR OUTDOOR USE NEED ENCLOSURE 3.) T & P RELIEF DRAIN TO BE EXTENDED WITHIN & 6" AFG. 4.) ADA BATHROOM DOES NOT MEET ADA REQUIREMENTS IT MAYBE ADA ACCESSSIBLE, BUT IS NOT ADA COMPLIANT. 5.) BREAK ROOM SINK NOT INSTALLED AT THIS TIME. | |
| 06/05/2002 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) THE APPROVED PLANS AND PERMIT MUST BE KEPT ON SITE AT ALL TIMES. 2.) 103.5.4.2. IT IS THE CONTRACTORS RESPONSIBLITY TO MAKE SURE THE WORK IS READY FOR INSPECTION BEFORE CALLING IT IN. |