Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2003 | GRADING - FINAL | Approved | ||
| 09/26/2003 | GRADING - FINAL | Partial Approval | SEE NOTES #2 AND #3 ON PREVIOUS INSPECTION. | |
| 08/29/2003 | GRADING - FINAL | Partial Approval | THE FOLLOWING ITEMS WERE NOTED AS INCOMPLETE DURING THE PREVIOUS INSPECTION: 1) EROSION HAS BEEN NOTED AT EACH OF THE INLETS INTO THE WATER HARVESTING BASINS LOCATED ON THE SOUTH SIDE OF THIS PROJECT. THESE WILL NEED TO BE REPAIRED AND EROSION PROTECTION MEASURES SHOULD BE INCORPORATED TO PREVENT FUTURE PROBLEMS. 2) ALONG THE NORTH SIDE OF THE EXISTING CONCRETE LINED CHANNEL DRAINAGE HOLES HAVE BEEN NOTED. THESE HOLES WILL NEED TO BE FILLED TO PREVENT ANY ADDITIONAL WATER FROM FLOWING BEHIND THE CHANNEL LINING. 3) PER THE APPROVED PLANS THE WATER HARVESTING BASIN LOCATED SOUTH OF THE TYPE 3 CATCH BASIN HAS NOT BEEN CONSTRUCTED AT THIS TIME. PLEASE INSTALL THIS BASIN PRIOR TO SCHEDULING ANOTHER INSPECTION FOR THIS SITE. |