Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T02BU02964
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/27/2010 | GRADING - FINAL | Approved | ||
05/04/2009 | GRADING - FINAL | Correction Required | I LOOKED AT THE SITE AND STILL FIND THE FOLLING ITEMS 5, 9, 13, 15, AND 16 ARE INCOMPLETE AT THIS TIME AS PREVIOUSLY NOTED ON THE INSPECTION DATED 1/30/2009. THERE HAS BEEN COMPLAINTS IN THE PAST THAT THE RETENTION/DETENTION BASINS NOT DRAIN IN THE GIVEN TIME FRAME AS DESCRIBED IN THE PIMA COUNTY/CITY OF TUCSON RETENTION/DETENTION MANUAL. THESE BASINS NEED TO BE CHECKED AND VERIFIED THAT THEY ARE WORKING AS THEY ARE SHOWN IN THE DRAINAGE REPORT FOR THIS SITE, AND A LETTER STATING THIS NEEDS TO BE FILED WITH THIS OFFICE. THE SITE HAS BEEN |
|
02/18/2009 | GRADING - FINAL | Denied | THE SITE WAS CHECKED AND FOUND TO BE INCOMPLETE AT THIS TIME. SEE PREVIOUS COMMENTS DATED 1/30/2009 AND ADDRESS ALL ITEMS AS PREVIOUSLY NOTED. PREVIOUS COMMENTS HAVE BEEN MADE FROM THE RESIDENCE LOCATED ON THE EAST END OF THE SITE THAT THE WATER HAS BEEN BACKING UP INTO THEIR DRIVEWAYS DUE TO THE GRADES NOT BEING PER THE APPROVED PLANS. VERIFY THIS INFORMATION IN THE PRESENTATION OF THE AS-BUILT DRAWINGS FOR THE SITE. |
|
01/30/2009 | GRADING - FINAL | Denied | Contractor has not addressed all items on punch list. Items 5, 9, 13, 15 and 16. | |
03/12/2007 | GRADING - FINAL | Partial Approval | Met with Craig Dawson ons ite and went over punch list for final inspection. | |
03/07/2007 | GRADING - FINAL | Partial Approval | Punch list: 1. Have engineer certify drainage and basins. Per chapter XIV, section 14.2 (7). 2. Repair wall opens, raise to grade. 3. Repair fence. 4. Remove all stormwater controls. 5. Submit as-built drawings for all basin and drainage channel. 6. Address erosion in basin #3, stabilize per approved drawings. 7. Backfill along perimeter wall. 8. Pick up old concrete along perimeter wall. 9. Provide positive flow into basin # 4. 10. Install security barrier for basin #4 11. Address drop off next to sidewalk, basin #3. 12. Repair concrete front of 3775. (hole) 13. Clean silt out of all basins. 14. Stabilize side slope north side of basin #1. Per approved plans. 15. Install rip rap pad in basin #4. Per approved plans, detail I/7. 16. Install orifice plate on bleeder pipe, per approved drawing. 17. Complete security barrier basin #5. 18. Address permit conditions: CONTACT PIMA COUNTY FOR RIGHT-OF-WAY PERMIT TO INSTALL HANDRAILING AND RIPRAP WITHIN BENSON HIGHWAY RIGHT-OF-WAY. |