Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T02BU02470
Inspection Description - GRADING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2006 | GRADING - FINAL | Approved | ||
| 01/12/2006 | GRADING - FINAL | Correction Required | PUNCH LIST FOR MATT QUINN KB HOMES Houghton Village T02BU02579 S02-023 -Basin B has welded handrail in place of removable post barricades (see note 1 sheet 2). -Plans call out a 42" high security around all basins. Railing not in place around Basin B or along north perimeter of Basin A. -All sediment controls need to be removed from Basin A. -Letters of certification need to be received for all drainage structures and basins. |
|
| 01/10/2006 | GRADING - FINAL | Correction Required | SITE IS MOSTLY COMPLETE. CONCERNS REGARDING BASIN B. REMOVABLE BARRICADES NOT INSTALLED AS CALLED OUT ON PLANS AND RAILING NOT INSTALLED AROUND BASIN AS IN PLANS | |
| 06/20/2005 | GRADING - FINAL | Not ready for Inspection | SITE IS COMPLETE WITH THE EXCEPTION OF SIDEWALK SECTIONS UNDER REPAIRE. ALSO HAVE PORTIONS OF SCREEN WALL BEING CONSTRUCTED. OWNER WILL BE CONTACTED TO DETERMINE WHEN WORK WILL BE COMPLETE AND FINAL GRADING INSPECTION REQUESTED. |