Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T02BU01919

Parcel: 11205047B

Inspection Status: Approved

Inspection History: GRADING - FINAL

Date Description Inspector Results Comments
06/02/2003 GRADING - FINAL Approved
04/24/2003 GRADING - FINAL Partial Approval 7) ADEQUATE ROOF DRAINAGE FOR THIS SITE HAS NOT BEEN PROVIDED. PER OUR DEVELOPMENT STANDARDS SECTION 2-08.3.1 ALL WATERS WITHIN THE 10 YEAR FREQUENCY IS TO PASS UNDER NEATH THE SIDEWALKS/PEDESTRIAN CIRCULATION PATHS. PLEASE SHOW HOW THE ROOF DRAINAGE CAN BE IMPROVED TO MEET THIS STANDARD. RIGHT NOW THE WATER FALLS DIRECTLY ONTO THE SIDEWALKS AND STAIRWAYS ALONG THE NORTH AND SOUTH SIDE OF THE BUILDING.

THIS IS THE ONLY ITEM THAT REMAINS FROM THE PREVIOUS LIST. THE DEVELOPER NEEDS TO PROVIDE INFORMATION DEMONSTRATING HOW HE WILL ACHIEVE PREVENTING RAIN WATERS FALLING ONTO THE SIDEWALKS/PED ACCESS AREAS.
03/27/2003 GRADING - FINAL Denied 1) DRAINAGE OPENINGS ARE NOT CONSTRUCTED AS SHOWN ON THE APPROVED PLANS, THE PLANS CALL FOR 16 OPENINGS, 12 HAVE BEEN PROVIDED. SEE KEYNOTE 12
2) THE CURB HAS BEEN DELETED AT THE DRAINAGE OUTLET. SEE KEYNOTE 21
3) THE TRASH ENCLOSURE IS NOT PER THE DEVELOPMENT STANDARDS. ADDITIONAL BOLLARDS ARE NEEDED OALONG THE REAR AND SIDE WALLS AND THE GATES STILL NEED TO BE INSTALLED.
4) BICYCLE LOCKERS HAVE BEEN SPECIFIED IN KEYNOTE 23 BUT HAVE NOT BEEN INSTALLED.
5) THE LOADING ZONE SHOWN ON THE NORTH SIDE OF THIS SITE HAS BEEN DELETED.
6) OPENINGS IN THE EXISTING WALL ON THE WEST SIDE OF THIS SITE HAVE BEEN COVERED WITH THE FILL DIRT FOR THIS SITE. MIGRATING MATERIAL FROM EROSION CAN BE EXPECTED IN THE FUTURE ONTO THE ADJACENT PROPERTY, DEMONSTRATE HOW YOU WILL PREVENT THIS FROM HAPPENING.
7) ADEQUATE ROOF DRAINAGE FOR THIS SITE HAS NOT BEEN PROVIDED. PER OUR DEVELOPMENT STANDARDS SECTION 2-08.3.1 ALL WATERS WITHIN THE 10 YEAR FREQUENCY IS TO PASS UNDER NEATH THE SIDEWALKS/PEDESTRIAN CIRCULATION PATHS. PLEASE SHOW HOW THE ROOF DRAINAGE CAN BE IMPROVED TO MEET THIS STANDARD. RIGHT NOW THE WATER FALLS DIRECTLY ONTO THE SIDEWALKS AND STAIRWAYS ALONG THE NORTH AND SOUTH SIDE OF THE BUILDING.