| 11/12/2002 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection 0000* | |
| 11/08/2002 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection 0999*1.) C3 F4 FOOTING ON LINE A CAST WITHOUT INSPECTION. 2.) ANCHORS IN SAME FOOTINGS "WET SET" WITHOUT CONSOLEDATION OF CONCRETE. 3.) LOADING DOCK @ A3.5 CAST WITHOUT INSPECTION. |
|
| 10/23/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000*NO APPROVED PLANS AVAILABLE OFFICE LOCKED. | |
| 10/01/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*F5 & F6 FOOTING LINE A | |
| 09/27/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*TILT UP PANELS COMPLETE. AND NORTH WEST & SOUTH FOOTING PERIMETER. | |
| 09/24/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 09/20/2002 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection 0999*HAVE ALL BARS IN PLACE PER DETAIL 6,7 & 5 PAGE 54.1. IE 3 #6 EACH FACE 4" O.C. AT LOWER SECTION. HIGH PANELS ALOS CANTILEVER PANELS REQUIRE #6 EACH FACE AT TOP. | |
| 09/13/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000*CANCELLED BY CONTRACTOR. | |
| 09/12/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000*NO NEW WORK SINCE LAST INSPECTION. | |
| 09/10/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*TILT PANELS 13,16,18,19,21,22,24,25,26,30,31, OK TO POUR. 2.) PANELS 23 & 28 NOT READY NEED 2 #'S WELDED TO WELD PLATE PER DETAIL 230. TERRACON REPORT OK THESE PANELS IS INVALID. | |
| 09/04/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*LINE 4,B,D,E,F, COL. FOOTERS PER 116/55.1 | |
| 08/28/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 08/01/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*C1 F2 FOOTING 10 EACH INTERIOR. 1.) I NEED COMPACTION REPORTS. 2.) KEEP ALL SPECIAL INSPECTION REPORTS @ JOB SITE. SPECIAL INSPECTION REPORTS FOR STEEL, WELDING ETC ARE REQUIRED TO BE HERE AND AVAILABLE BEFORE I BEGIN MY INSPECTION. | |
| 07/25/2002 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection 0999*1.) PROVIDE ENGINEERED SOIL PLACEMENT AND COMPACTION REPORTS 2.) CLARIFY WHICH OF THE LISTED SPECIAL INSPECTIONS ARE REQUIRED FOR THIS JOB PAGE 51.1. PROVIDE SPECIAL INSPECTION FIELD REPORT FOR ALL REQUIRED SPECIAL INSPECTIONS DURING THE COURSE OF THIS JOB. 3. HAVE ANCHOR BOLTS READY. |